Turbine / fan / the invite public bidding such as machine giving coal

From;  Author:Stand originally
Project specification
  • Project name: Turbine / fan / the invite public bidding such as machine giving coal
  • Number of invite public bidding: WEME - 0809HBHS
  • What belong to an industry: Mining industry - > mining equipment
  • Date of invite public bidding: 2008-10-10
  • Project area: North of Anhui the Huaihe River
Invite public bidding announcement content
  • Item of invite public bidding is main equipment: To water pump turbine, middling speed the machine that grind coal, electron says heavy style gives dust catcher of coal machine, low-pressure heater, report, fan, steam to use water supply pump
  • Content of invite public bidding:

    Project of hill of small 2×600MW tiger is controlled greatly on announcement of invite public bidding of equipment of the first batch of subsidiary engine

    Suffer the commission of person of invite public bidding, with respect to project of hill of this factory tiger equipment of the first batch of subsidiary engine undertakes home makes public invite public bidding,

    One, fundamental condition:
    1.Build an unit: Person of invite public bidding
    2.Build a place: Big Tang Huai presses spot of project of small tiger hill to be located in intense of southeast of city of north of the Huaihe River of the Anhui province greatly on boreal power plant Tuan of a mountainous area the Song Dynasty presses down churchyard, the site of factory is apart from urban district of north of the Huaihe River to make an appointment with 22km, be apart from 17km of Sui brook county. The site of factory 3 annulus hill, shao Shan is in (the highest Cheng makes an appointment with 117m, tall Cheng of 56 years of Yellow Sea, similarly hereinafter) , the east is grimalkin hole (125.2m) , southwest face is Hu Shan (163m) . The site of factory west make an appointment with 1000m to add up to Xu (Hefei —— Xuzhou) freeway.
    3.Project brief introduction: Hill of tiger of north of big Tang Huai sends electrical engineering Cheng is invite public bidding little surprise ground is pressed to build project project greatly on the person,
    Plan to build hill of tiger of north of big Tang Huai to send electrical engineering Cheng, this period capacity 2×600MW, stay have again the leeway of extend 2×600MW. Project of small tiger hill is controlled greatly on plan of the first unit moves at will be being thrown in August 2010, the 2nd aircrew plans to move at will be being thrown in October 2010.
    4.Content of invite public bidding:
    1, turbine of water supply pump
    2, steam uses water supply pump
    3, condensate pump